Manufacturer: VoltecoVoltus
Inexpensive and reliable 2-seat golf cart with a Korean manufacturer's body. Rich standard equipment, powerful electric motor. 36 Months Warranty
BASIC COMPLETION:
Roof, windshield, waterproof seats, armrests, lights, rear-view mirrors, coasters, card holder, glove box, sound signal, battery indicator, reverse gear
OPTIONS (not included in the price):
Storage pouch, rain cover, seat belts, folding windshield, dashboard, built-in charger
It is possible to purchase electric cars and golf carts in other trim levels and with other technical characteristics, consult with managers for advice.
In Voltus, you can purchase electrical equipment on credit or in installments. Buy a golf car Voltus GF2 CARGO you can by clicking the "buy" button or calling our managers. We make delivery in Moscow, Sochi and throughout Russia. Golf cart is the best means of transportation in ecologically clean areas. All the electric transport is provided with a corporate guarantee.
Parameter | Meaning |
---|---|
battery | 48V |
controller | ZAPI ACE |
Engine power | 4 kw АС |
Charger | 110/220V |
Brakes | mechanical, drum |
Max speed up | to 32 km/h |
Power reserve is empty up | to 90 km |
Up | to 20% |
Turning radius | 3.5 m |
Clearance | 120 mm |
frame | high-strength steel |
Housing | GRP |
Suspension | with shock absorbers |
Steering | self-compensating steering rack |
Transmission | automatic, front / rear |
Dimensions: | |
Dimensions of the car | 2670х1180х1890 |
Dimensions of the car | 700х1070х250 |
The size of the wheels | 205/50R10 (cast) |
Car weight | 581 kg |
Color | to choose from |
The Volteco Company has a network of logistics and technical centers, where the final assembly and pre-delivery inspection take place. The car cost is indicated when being shipped from one of the logistics centers.
Shenzhen (People’s Republic of China). The production time is 2 to 4 weeks after receiving 50% of the advance payment.
Singapore. The production time is 6 to 8 weeks after receiving 50% of the advance payment.
Barcelona (Spain). The production time is 8 to 12 weeks after receiving 50% of the advance payment.
Dmitrov (Russia). The production time is 12 to 16 weeks after receiving 80% of the advance payment.
The payment shall be made on our current account at our European office.